Venue: Guildhall, Windsor - Guildhall
Contact: Wendy Binmore 01628 796251
No. | Item |
---|---|
APOLOGIES FOR ABSENCE To receive any apologies for absence. Minutes: Apologies for absence were received from Councillors Michael Airey and Samantha Rayner. |
|
DECLARATIONS OF INTEREST PDF 237 KB To receive any declarations of interest.
Minutes: None. |
|
To confirm the minutes of the previous meeting. Minutes: RESOLVED UNANIMOUSLY: That the Part I minutes of the meeting held on 10 October 2018 be approved subject to the following amendment:
That the following be added: The Panel held a minutes silence in memory of Councillor Jesse Grey. |
|
PLANNING APPLICATIONS (DECISION) PDF 12 KB To consider the Head of Planning’s report on planning applications received.
Full details on all planning applications (including application forms, site plans, objections received, correspondence etc.) can be found by accessing the Planning Applications Public Access Module at http://www.rbwm.gov.uk/pam/search.jsp Additional documents: Minutes: 18/02344* Upgrade and renewal of existing services to the moorings including replacement of existing electric hook-up and water points, replacement of existing mooring bollards with mooring rings, upgrading of black and grey water drainage system with installation of bespoke drainage system and replacement of existing storage sheds at the Moorings, Willows Riverside Park, Windsor SL4 5TG – THE PANEL VOTED UNANIMOUSLY to refuse planning permission as the Panel decided that the proposal, because of the number and design of the proposed mooring rings and the increased height of the proposed new storage sheds would have a harmful impact on the openness and character of the Green Belt and would have an urbanising effect. The panel determined that no very special circumstances have been advanced that justify the harm caused by virtue of the proposed inappropriate development.
(The Panel was addressed Richard Endacott and Keith Hughes in objection and Jeremy D Lambe, the Agent on behalf of the applicant).
17/03743 Mr Gorslar: Change of use of part ground floor and basement from A1 (Retail) to B1a (Offices) and part residential (1no. Studio Flat). Demolition of existing garages, alterations and extensions including a second floor extension and rear extensions to create 2no. 1 bed flats, 1no. 1 bed dwelling and cycle/bin store at 75 -75A Victoria Street, Windsor – THE PANEL VOTED UNANIMOUSLY to approve the application and grant planning permission with the conditions listed in Section 13 of the Main Report as per the Head of Planning’s recommendations.
|
|
ESSENTIAL MONITORING REPORTS (MONITORING) PDF 58 KB To consider the Essential Monitoring reports.
Minutes: All details of the Essential Monitoring Reports were noted. |