Agenda and minutes

Venue: Desborough 2 & 3 - Town Hall

Contact: Karen Shepherd 

Items
No. Item

1.

Apologies for Absence

Minutes:

None received

2.

Declarations of Interest pdf icon PDF 131 KB

To receive any declarations of interest.

 

Minutes:

Councillors Dudley, Love and Wilson declared interests in the item ‘Maidenhead Waterways – Completion of York Stream and Weir’ as attendees at the Waterways Board meeting.

 

Councillor Dudley declared an interest in the item ‘Braywick Court School’ as Chair of Governors at Riverside Primary.

3.

Maidenhead Waterways - Completion of York Stream Channel Works and Weir pdf icon PDF 387 KB

To consider the above report

Minutes:

Members considered a budget request for Stages 2A, 2B and 2C of the scheme to complete the York Stream arm of the project and raise the water levels, allowing the western half of the ‘Ring’ to be landscaped.  The Lead Member for Planning explained this was a key project in the town centre. The contractor (Greenfords) had been appointed in November 2014. Works already undertaken on stage 1 now required additional works, which had resulted in a budget pressure. 

 

Members noted that Stage 2c related to the weir project and would see the water level raised to a depth of approximately 1.5m. If the works were not undertaken, the waterway would be similar to a storm ditch and would likely dry out in summer.  The Lead Member for Planning explained that the Shanly Group had already begun works on Stages 1 and 2 of its waterside development. Phase 3 of the development would complete the single western stretch by December 2017. Originally Greenford had been asked to undertaken the widening works on this stretch, but this had been stopped as the Shanly Group had decided to undertake the works at their own cost. If the works were not completed, the council would then need to agree financing to finish the channel at a lower specification. It was noted that that Phase 3 of the development was currently only at outline planning stage. Conditions relating to the widening on the full planning application could be considered at the appropriate time.

 

The Lead Member for Planning advised that there were a number of sewer diversions required as part of the project, including the relocation of a twin pump main. He had highlighted to Thames Water that Maidenhead Waterways was a charity and as such he hoped the cost estimate of £1.5m would be revisited. Further feedback was awaited.

 

Members noted that a raised section would be inserted along the footpath under the A4 to minimise flooding. Future new tenants of the Tor building would be approached to aid construction of a proper footpath into the town centre.

 

The Chairman highlighted that if the funding was agreed by the Sub Committee, the works would ensure the waterway would not dry out in summer and the water level would be raised to provide a depth of approximately 1.5m along the stretch. It was confirmed that small vessels such as skiffs and punts would then be able to navigate the waterway; on some stretches two boats could pass. The minimum width on the one-way stretches was 3.6m; the maximum on the two-way stretches was 7m.

 

It was confirmed that the £0.25m match funding from the Shanly Group would be received on completion of the amphitheatre, which was expected in Spring 2016.  The Regeneration Project Manager explained that she was confident with the cost figures for the piling and design elements of the scheme. The biggest risk related to the sewer diversions; final confirmation of costs was awaited from Thames Water. The Regeneration Project Manager confirmed  ...  view the full minutes text for item 3.

4.

LOCAL GOVERNMENT ACT 1972 - EXCLUSION OF THE PUBLIC

To consider passing the following resolution:-

 

“That under Section 100(A)(4) of the Local Government Act 1972, the public be excluded from the remainder of the meeting whilst discussion takes place on items 6-9 on the grounds that they involve the likely disclosure of exempt information as defined in Paragraphs 1-7 of part I of Schedule 12A of the Act"

Minutes:

RESOLVED UNANIMOUSLY: That under Section 100(A) 4 of the Local Government Act 1972 the public be excluded from the meeting whilst discussion took place on items 5-8 on the grounds that they involved the likely disclosure of exempt information as defined in Paragraphs 3 and 4 of Part I of Schedule 12A of the Act.

 

5.

Maidenhead Waterways - Completion of York Stream Channel Works and Weir

To note the Part II appendices to the above report

6.

Regeneration Additional Budget Request

Item withdrawn; deferred to January meeting

7.

Braywick Court School

To receive the above report

8.

Work Programme

To consider items for future meetings.

 

Scheduled meetings:

 

Thursday 14 January 2016